Keep your plants
up to date.
| Process step | OPEX reduction | Measure 1 | Measure 2 | Measure 3 | Measure 4 |
| Crushing | 30 % | 20 % power savings | 40 % longer lifetime | 60 % higher availability | 25 % capacity increase |
| Raw grinding | 20 % | 20 % production increase | 3x longer lifetime | 30 % higher availability | 20 % power savings |
| Pyroprocessing | 25 % | 20 % capacity increase | 50 % higher lifetime | 15 % higher availability | 20 % power savings |
| Cement grinding | 30 % | 150 % production increase | 10x longer lifetime | 15 % higher availability | 25 % power savings |
Up to 30 % OPEX reduction.
Up to 20 % power savings — upgrading the hydraulic drive to an electromechanical system improves reliability, optimizes power consumption, and lowers spare parts costs
Up to 40 % longer lifetime — improved wear part protection extends service intervals
Up to 60 % higher availability — modular upgrades minimize downtime
Up to 25 % capacity increase — optimized rotors, modular upgrades and smart integration significantly increase throughput, availability and efficiency
Up to 20 % OPEX reduction.
Up to 20 % production increase — optimized grinding concepts, improved material intake and reduced false air intake enable higher throughputs at unchanged installed power
Up to 3x longer lifetime — advanced wear protection concepts and stabilized grinding conditions extend service intervals and component lifetime
Up to 30 % higher availability — improved process stability and modular upgrade concepts minimize downtime and increase operational reliability
Up to 20 % power savings — lower energy consumption by implementing recommendations from experts as well as mechanical upgrades to reduce the pressure drop
Up to 25 % OPEX reduction.
Up to 20 % capacity increase — optimized burners, preheaters and coolers reduce specific heat consumption
Up to 50 % higher lifetime — reduced thermal and mechanical stress extends service intervals
Up to 15 % higher availability — stable kiln conditions minimize shutdowns and unplanned stops
Up to 20 % power savings — the implementation of graphite sealing technology reduces false air ingress
Up to 30 % OPEX reduction.
Up to 150 % production increase — optimized grinding layouts, improved classification efficiency and reduced internal material circulation enable higher throughput and doubling the grinding capacity
Up to 10x longer lifetime — advanced wear protection concepts and optimized grinding conditions extend service intervals and component lifetime
Up to 15 % higher availability — modular upgrades, redundant drive concepts and improved process stability minimize downtime and increase operational reliability
Up to 25 % power savings — improvements in separation efficiency and pressure loss as well as improvements on the grinding method to interparticle comminution
| Engineering studies | Inspection & audits · environmental analyses · feasibility studies · studies for debottlenecking |
| Plant optimization | Customer-specific solutions for revamps and retrofit · capacity expansion via debottlenecking · efficiency enhancement through equipment modernization · emission reduction · improvement of plant availability |
| Lab automation | To enhance your plant efficiency and improve your plant's operating safety |
When your feed conveyor is due for repair or refurbishment, our crushing technology experts can engineer a modern state-of-the-art apron feeder into the existing installation. Based on technological, erection and cost aspects, it must be decided if the old mainframe can or shall be used further on.
When thyssenkrupp or former companies of thyssenkrupp had been the OEM supplier, we usually do have the design drawings — then it can be checked if parts of the mainframe can be reused to reduce invest and assembly costs. In other cases we offer a site survey including a 3D laser scan, ensuring the machine fits the plant with a minimum of modifications on site. The RKF system can be fitted in our own as well as in competitor crushing plants, and has proven in more than 300 installations worldwide that it is a tough and low-maintenance machine.
SERVICE ADVANTAGES
Efficient project execution
OEM parts to guarantee quality
Cost efficient due to reusing of machine components (substructure, feed bin, guiding plates)
Short plant down time (only 2–3 weeks)
In long term view, significant reduction of maintenance costs
Combined with our field service team, we are able to offer on EPC basis
When your process requires a new one or your old powder cooler is at the end of the lifecycle, we integrate a new powder cooler into the existing circuit — including dis- and reassembly as an EPC project. The cooler reduces cement temperatures after grinding plants for easy storage in silos, reduces the lump formation tendency (hydration) within silo storage, and improves bag filling at the packing plant or bulk loading.
SERVICE ADVANTAGES
Proven and strong construction with low maintenance requirement
Experienced team with high machine relevant knowledge
OEM parts to guarantee quality and spare parts availability
High precision cooler manufacturing at thyssenkrupp's own workshops
All tasks in one hand — from project stage to hot commissioning of the optimized circuit
Based on cooperation with you, and an onsite survey in combination with material samples, our crushing technology experts investigate the potential of a revamp project. More than 20 rotors have already been successfully implemented for third party crushers — for hammer, impact and roll crushers, sizers and hammer mills all over the world. The aim is to reduce OPEX through the extended lifetime of the rotor body and wearing parts and through improved crusher output; CAPEX is held low by keeping the crusher housing untouched as far as possible.
SERVICE ADVANTAGES
Cost-effective alternative compared to new invest
Short down time for assembly
Decreasing OPEX costs at low CAPEX invest
Increase of plant availability and lifetime
More wear resistant solutions and optimized wear mass
Maintenance friendly constructions
Full industrial life cycle management of crusher rotors. Our experts assess the current condition of the rotor and provide a report on the condition and the required spare parts scope, so the decision to repair or replace is made on evidence. We provide a full range from a simple assessment, over on-site repairs, to full workshop refurbishments in a service center near you. As OEM we supply all components and refurbishments to thyssenkrupp cement crushing plants, which also include parts of former companies such as O&K, Hischmann and MIAG.
SERVICE ADVANTAGES
Global network of service centers close to you
Minimization of downtime
Cost-effective alternative compared to new invest
Increase of plant availability and lifetime
Reliable and easy to plan
Service for all kind of rotors
Full access to the thyssenkrupp competence center
| Claim | Evidence |
| The largest single service order to date was on third-party kiln lines | Heidelberg Materials Poland relied on thyssenkrupp Polysius to solve problems with the rotary kilns at its Górażdże plant — the largest single order to date for the Service Team in terms of value, for kiln lines from a third-party supplier |
| The RKF system fits competitor crushing plants | In several projects around the world our team has proven that the RKF system can be fitted in our own as well as in competitor crushing plants |
| More than 20 rotors already built for Third-party crushers | Executed for hammer, impact and roll crushers, sizers and hammer mills all over the world |
| Including the machines of former companies | As OEM we supply all components and refurbishments to thyssenkrupp cement crushing plants, which also include parts of former companies, e.g. O&K, Hischmann, MIAG |
Heidelberg Materials Poland relied on the technical expertise and technology of thyssenkrupp Polysius to solve problems with its rotary kilns. The largest single order to date for the Service Team in terms of value — for kiln lines from a third-party supplier.
A modern, alternative system — the new double-shaft hammer crusher — implemented into an existing building to improve raw material grinding efficiency
Optimisations already realised by us provide the proof that almost any plant has the potential for performance maximisation and resource consumption minimisation.
up to date.