Level Up Your Plant.
engineering. tomorrow. together.
As a trusted partner with over 165 years of experience, polysius leverages its technological expertise and deep process know-how to revitalize existing plants, uncover hidden costs, and deliver tailored modernization solutions that sustainably enhance technical performance and significantly reduce OPEX.
Our services are not only tailored to our own products — they cover installations from third-party suppliers alike. More than 160 years of experience, more than 800 cement plants built worldwide.
engineering. tomorrow. together.
Mechanical and process audits reveal how machines and processes interact in real operation — making hidden cost drivers visible
Wear-part configuration, drive concepts and control strategies adapted to today's raw material, not to the original design case
Reduce kWh/t overall and kCal/t clinker as two independent, addressable cost lines
Measures scoped to fit planned shutdowns wherever possible
Pyro line preparation first — the supporting systems must be ready before any major expansion or fuel switch
Prepol®-SC step combustor as the platform for high thermal substitution rates
Target picture in our reference roadmap: TSR above 75 % for the whole line
Fuel flexibility protects you when a single energy contract moves against you
Lower clinker factor and reduced CO₂ emissions per tonne of cement.
Enhanced clinker fineness to maintain cement performance and strength development.
Increased cement production from the same kiln clinker output.
Improved grinding efficiency and lower specific power consumption.
Cost-effective modernization of existing grinding facilities with minimal plant modifications.
Roadmap logic: pyro line preparation → raw grinding → cement grinding → quality control → alternative fuels
Retrofit-first: retain major structural elements wherever possible, replace what actually wears
Modular upgrade concepts keep shutdown windows short and predictable
Total invest, total saving, average ROI and investment period made explicit before you commit
To strengthen the overall resilience of the plant, the basis for increasing capacity and ensuring sustainable operation is the proper preparation of the pyro line and its supporting systems before any major expansion or modification begins.
To increase the capacity of the entire line to more than 1,800 t/d of clinker, raw material preparation must be enhanced. By implementing a pre-grinding system, a capacity of approximately 160 t/h is achievable.
To process the increased clinker capacity profitably, cement grinding capacity must be significantly increased. By integrating a polycom® system, the capacity can be raised to more than 220 t/h.
An integrated interface is required to maintain optimal cement quality under varying process conditions. It is not the additional technologies that enable the transformation — but the ability to manage their variability. This is exactly where polab acts as the link.
The use of alternative fuels reduces the carbon footprint and strengthens environmental performance while significantly lowering energy OPEX — with a strong positive impact on financial resilience and long-term competitiveness.
Three levers that compound: lower kCal/t clinker, higher AF substitution, lower clinker factor
Emission reduction delivered through the same measures that lower OPEX — not in addition to them
Documented performance data as the basis for green product claims